| Hangar |
Aircraft |
Category |
Date |
Preview |
| BriandKilby | Dumas Kit #225, Messerschmitt 109 G | Parked | 12-Mar-11 16:05 |  | | Views : 4165 | | add landing gear? |
| BriandKilby | Dumas Kit #225, Messerschmitt 109 G | Parked | 12-Mar-11 16:05 |  | | Views : 4253 | | finished |
| John M Oshust | AerodromeRC Sopwith Triplane | Build | 12-Mar-11 15:31 |  | | Views : 1038 | | More rigging today. Wires of decreasing diameter. This side's rigging is still not complete. Two rear "drag" wires are need. I had enough "Fun" for today. |
| John M Oshust | AerodromeRC Sopwith Triplane | Build | 12-Mar-11 15:29 |  | | Views : 997 | | Ailerons on the right side, starboard side, or off side are stitched and mounted. They must be connected. Red star added. I should have "starred" before I stitched!!! Options now... remove stitching and reinstall or install star around stitching. If I can match the red in the star, I can over paint the stitching....if not , the stars stay as they are. |
| stirling | Scratch Built Yak 25M "Flashlight" | Build | 12-Mar-11 01:10 |  | | Views : 2480 | | Rudder build. Everything takes that little bit longer as I adjust things for the extra size. The original plan called for the rudder to be made with 1.5mm wood. Some how I don't think that would work here. |
| stirling | Scratch Built Yak 25M "Flashlight" | Build | 12-Mar-11 01:06 |  | | Views : 2440 | | Port wing almost ready or paint and outrigger strut and wheel. |
|
|