Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   1718   1719   1720   1721   1722  [ 1723 ]  1724   1725   1726   1727   1728   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
RTD89Guillows Series 400 - P-40 WarhawkParked11-Mar-11 21:08
Views : 1304
RTD89Guillows Series 400 - P-40 WarhawkBuild11-Mar-11 21:08
Views : 1362
Finally got the wings covered. Now for filling, sanding, filling, and more sanding!
SteveMDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild11-Mar-11 19:42
Views : 1468
Small pieces of Sullivan cable tubing guide the rudder pull-pull lines where they exit the fuselage. The plans give no guidance on this exit so I borrowed ideas from the builds of others.
SteveMDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild11-Mar-11 19:40
Views : 1491
Thread is temporary till I find something more suitable. Brass rod provieds a means to tighten and rough trim.
moostang51Guillows Series 800 - Bell P 39D AiracobraBuild11-Mar-11 16:39
Views : 1480
Cockpit finally complete. Sorry for the glossy shine, but that is an application of future so I can weather it with a wash later on.
moostang51Guillows Series 800 - Bell P 39D AiracobraBuild11-Mar-11 16:36
Views : 1531
"LEFT" side cockpit with fire extinguisher.
Hangar Aircraft Category Date Preview
moostang51Guillows Series 800 - Bell P 39D AiracobraBuild11-Mar-11 16:35
Views : 1397
Bottom cockpit console and stick with cannon button installed.
moostang51Guillows Series 800 - Bell P 39D AiracobraBuild11-Mar-11 16:33
Views : 1422
Seat with new belts. Comrade Rechkalov and Moostang very happy.
Roring40Guillows Series 800 - MosquitoBuild11-Mar-11 16:01
Views : 1637
Mossie madness, stringers for Africa. Front former area of the fuse is due for a haircut at some stage to represent the shorter set up on the FB model.
John M OshustAerodromeRC Sopwith TriplaneBuild11-Mar-11 15:24
Views : 1109
Ailerons taped into place for a fitting.
John M OshustAerodromeRC Sopwith TriplaneBuild11-Mar-11 15:23
Views : 1062
Listed as the "Starboard" flying wires on the official Sopwith plan. I guess the Sopwith was more formal in direction than the USAF!!
John M OshustAerodromeRC Sopwith TriplaneBuild11-Mar-11 15:21
Views : 1010
Flying wires are double and pass thru the tip of the middle wing. On this model they are structural and really lock the wings.
Page (3344 in total) :  <<   1718   1719   1720   1721   1722  [ 1723 ]  1724   1725   1726   1727   1728   >>  [ < Prev ] [ Next > ]