| Hangar |
Aircraft |
Category |
Date |
Preview |
| Creosotewind | ACE M-4 Sherman Tank | Parked | 16-Mar-11 14:43 |  | | Views : 1327 | | All 6 are done. Now I just need to add them to the tank. Oh, and cut out the track. Should be fun. |
| Creosotewind | ACE M-4 Sherman Tank | Parked | 16-Mar-11 14:38 |  | | Views : 1350 | | To the left is my first attempt. The "grill" was too heavy so I tried again. Each bogie has about 35 pieces when completed. |
| Creosotewind | ACE M-4 Sherman Tank | Parked | 16-Mar-11 14:34 |  | | Views : 1225 | | Starting on the bogies for the Sherman. In the lower right is the kit part. They would have you add some 1/16" pieces to the front, drive a nail through each end piece, through the wheel and into the tank side. Not to realistic. The top two are the front and back, my solution. I couldn't figure out how to cut the compound shapes so I made them out of cut and folded paper. You can see the patterns |
| David Duckett | Dumas Kit #327, Navy AD-2 | Reference | 15-Mar-11 22:00 |  | | Views : 1361 | | The canopy for the A1-E |
| David Duckett | Dumas Kit #327, Navy AD-2 | Build | 15-Mar-11 21:59 |  | | Views : 1263 | | I'll fill in all the spaces this time. |
| David Duckett | Dumas Kit #327, Navy AD-2 | Build | 15-Mar-11 21:57 |  | | Views : 1336 | | The bottom of the wing is flat so I filled in all the spaces between the ribs with 1/16" stock. |
|
|