|
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| pfinn | Shortys Basement BV-215 | Reference | 04-Jul-09 10:05 |  | | Views : 1597 | | Dumas Stinson Reliant I built for my Dad a couple years back over a period of a year or two. He likes them in the "Skeleton" state. Now he wants this one covered since I've gotten back "into" this stye of modelling. I told him " You dope it and sand it, then I'll cover it." Well, here he is sanding. Guess I've got a covering job coming up! The drag is that it's already fully assembled. |
| rhysleo | GWS Slow Stick | Reference | 04-Jul-09 09:04 |  | | Views : 1271 | | james, what do you think? |
| David Duckett | Dave Diels Engineering, Inc Kit #3, Grumman F8F-2 Bearcat | Build | 03-Jul-09 21:36 |  | | Views : 4470 | |
| David Duckett | Dave Diels Engineering, Inc Kit #3, Grumman F8F-2 Bearcat | Build | 03-Jul-09 21:35 |  | | Views : 4389 | | Inner main landing gear doors attached |
| pfinn | Shortys Basement BV-215 | Build | 03-Jul-09 17:03 |  | | Views : 1199 | | Wing framed up quicker than setting up the shims. The notches for the stringers are laser cut undersize so the builder can open them up at the correct angle (sweep-back) for a nice fit. Quite thoughtful designing. |
| pfinn | Shortys Basement BV-215 | Build | 03-Jul-09 16:59 |  | | Views : 1254 | | Instructions are quite implicit to insure correct washout. After making th shims, I matched the bottom of the airfoil profile on a sanding block (tounge depresser) and slightly sanded the shims so the trailing edge stock conforms to the airfoil shape during assy. |
|