| Hangar |
Aircraft |
Category |
Date |
Preview |
| BillParker | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 31-Aug-09 15:47 |  | | Views : 6921 | | Guest Painter... |
| BillParker | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 31-Aug-09 15:46 |  | | Views : 6978 | | Guest Enginneer... |
| John M Oshust | Dumas Kit #1805, Waco ARE | Build | 31-Aug-09 14:35 |  | | Views : 1077 | | Handling the model was becoming a liability. The old fingers kept breaking the 1/16 stringers in the nose. Instead of starting the seats, I elected to plank the nose. Planking completed and rough sanded. Planking with balsa strips was also the easiest way for me to obtained the necessary contours. |
| David Duckett | Dave Diels Engineering, Inc Kit #23, Grumman F7F-3 Tigercat | Build | 30-Aug-09 18:06 |  | | Views : 1262 | | A bit of fine tuning and it's off to the paint shop. |
| David Duckett | Dave Diels Engineering, Inc Kit #23, Grumman F7F-3 Tigercat | Build | 30-Aug-09 18:04 |  | | Views : 1195 | | The national insignia and letters will be painted on so to facilitate that, the stabilizer will not be attached until that's done. |
| David Duckett | Dave Diels Engineering, Inc Kit #23, Grumman F7F-3 Tigercat | Build | 30-Aug-09 17:59 |  | | Views : 1218 | | Everything is covered except the control surfaces which will be covered and painted before assembly. |
|
|