Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   2264   2265   2266   2267   2268  [ 2269 ]  2270   2271   2272   2273   2274   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustDumas Kit #1805, Waco AREBuild21-Sep-09 20:06
Views : 1051
The four main struts are in the hands of the molecules. Tomorrow is another day. One pair of main struts are still required anterior to the lower wing cut out. I should be able to remove the foam block tomorrow and install them. A pair of bracing struts are still required as are bracing wires.
John M OshustDumas Kit #1805, Waco AREBuild21-Sep-09 18:24
Views : 1093
Waiting for the molecules to set. After this is solid, I will fabircate and attach a wire strut in the rear. Just before the space for the lower wing.
John M OshustDumas Kit #1805, Waco AREBuild21-Sep-09 18:21
Views : 964
The wire strut will be covered and shaped. The wire should slip from the tube epoxyed to the float. The tube will be covered with an Al mounting plate.
John M OshustDumas Kit #1805, Waco AREBuild21-Sep-09 16:00
Views : 965
According to my measuring stick, the fuse is centered over flotsam and jetsam.
John M OshustDumas Kit #1805, Waco AREBuild21-Sep-09 15:59
Views : 958
The floats are forward of the engine as per reference photo. The scrap prop clears the floats.
John M OshustDumas Kit #1805, Waco AREBuild21-Sep-09 15:57
Views : 952
Starting construction of the float struts.
Hangar Aircraft Category Date Preview
John M OshustDumas Kit #1805, Waco AREBuild20-Sep-09 14:11
Views : 938
The dowels have been amputated to give the required width. You can see the Al tubing, a large ferrule, which holds the assembly together. My goal is to fabricate the float mounts as two halfs that slip together and mount onto the fuse. This will make my transport easier.
John M OshustDumas Kit #1805, Waco AREBuild20-Sep-09 14:07
Views : 950
A great deal of thought will be required before the float stuts are manufactured and installed. Proper positioning is critical.
John M OshustDumas Kit #1805, Waco AREBuild20-Sep-09 14:06
Views : 1006
When the Float struts are made the fuse must be a tad higher and the final prop a tad smaller than the scrap prop.
John M OshustDumas Kit #1805, Waco AREBuild20-Sep-09 12:39
Views : 1006
Staring the float assembly.
John M OshustDumas Kit #1805, Waco AREBuild20-Sep-09 12:38
Views : 940
When the epoxy on the dowels sets, the dowels can be cut to give the required spacing with the fuse. Tubing ferrules will allow me to adjust the width to the rquired fit.
David DuckettDave Diels Engineering, Inc Kit #23, Grumman F7F-3 TigercatBuild19-Sep-09 19:48
Views : 1179
First trial fit.....
Page (3344 in total) :  <<   2264   2265   2266   2267   2268  [ 2269 ]  2270   2271   2272   2273   2274   >>  [ < Prev ] [ Next > ]