| Hangar |
Aircraft |
Category |
Date |
Preview |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 01-Feb-11 10:21 |  | | Views : 978 | | When the glue is dry the taping begins. I always use low tack "Drafting Tape". |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 01-Feb-11 10:17 |  | | Views : 941 | | The vac canopy is installed |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 01-Feb-11 10:15 |  | | Views : 894 | | The spinner is painted white and set aside to dry. |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 01-Feb-11 10:14 |  | | Views : 934 | | A little paint test on the side of the fuselage to see if the colors will work. |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 01-Feb-11 10:11 |  | | Views : 974 | | The armored headrest, seat and instrument panel are installed and the paint has been added preparing for instalation of the vac canopy. |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 29-Jan-11 12:58 |  | | Views : 985 | | Five small intaked are on the lower nose. |
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 29-Jan-11 12:57 |  | | Views : 974 | | The gun troughs amd small intakes are in place behind the laminated and sanded spinner. |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 29-Jan-11 12:53 |  | | Views : 1001 | | The tail wheel and fairing are in place. |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Parked | 29-Jan-11 12:51 |  | | Views : 1118 | | The instrument panel, seat back, armor plate, intakes, and tail wheel are some of the details that are ready for installation. |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 29-Jan-11 12:48 |  | | Views : 958 | | The instrument panel is finished. |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 29-Jan-11 12:45 |  | | Views : 980 | | The lines that to me makes it one of the most beautiful aircraft of WW2 are apparent in this stick together. |
| jerry campbell | Dave Diels Engineering, Inc Kit # 24, Macchi MC 202 Folgore | Build | 29-Jan-11 12:42 |  | | Views : 1042 | | After returning from a two week Christmas Rhine Cruise with a gargantuane cold/upper resperatory infection that has had me "under" the bed for almost a month I have finally gotten back to work on the Macchi. |
|