|
Main Menu
User Login
View By Aircraft
Top Ten Aircraft : (numbers in brackets represent number of images online)
Top Six Manufacturers :
|
Browse Images
|
Virtual Aerodrome Image Browser
( Small / Large )
|
Show :
All |
Parked |
Flying |
Build |
Aerial |
Reference
|
| Page (425 in total) :
<< 274 275 276 277 278 [ 279 ] 280 281 282 283 284 >> |
[ < Prev ] [ Next > ] |
| Hangar |
Aircraft |
Category |
Date |
Preview |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 03-May-09 20:30 |  | | Views : 3597 | | The Shinden was designed to attack B-29s and would have but for the end of the war stopping production. This is 1/24 scale and fairly close to that beast Poppy is building which is 1/20. |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 02-May-09 22:11 |  | | Views : 965 | |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 02-May-09 22:10 |  | | Views : 931 | |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 01-May-09 21:15 |  | | Views : 892 | | OK, now the prop..... |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 01-May-09 21:13 |  | | Views : 824 | |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 01-May-09 21:12 |  | | Views : 877 | | The wheels and gear doors are glued in place, the front gear is still loose. |
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 01-May-09 21:10 |  | | Views : 889 | | How I spent the day |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 29-Apr-09 16:29 |  | | Views : 863 | | Ready for the 11' prop, 5 1/2" at this scale. |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 29-Apr-09 16:25 |  | | Views : 889 | | The fins are glued in place. |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 29-Apr-09 16:22 |  | | Views : 904 | |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 29-Apr-09 16:21 |  | | Views : 921 | | The main gear is glued in place. Yes, this is scale. |
| David Duckett | Dave Diels Engineering, Inc Kit #10, Kyushu J7W1 Shinden | Build | 28-Apr-09 19:41 |  | | Views : 897 | | Ready to stand on its own legs |
|
| Page (425 in total) :
<< 274 275 276 277 278 [ 279 ] 280 281 282 283 284 >> |
[ < Prev ] [ Next > ] |
|