Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (92 in total) :  <<   11   12   13   14   15   16   17   18   19   20   21   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
Don CScratch Built Douglas F4D SkyrayBuild28-Jun-20 16:46
Views : 628
Wheels,lg and weapons pylons
Don CScratch Built Douglas F4D SkyrayBuild28-Jun-20 16:44
Views : 674
Closed some of the LG doors
Don CScratch Built Douglas F4D SkyrayReference28-Jun-20 13:04
Views : 698
Straimed: note the fuselage insignia.
Don CScratch Built Douglas F4D SkyrayBuild14-Jun-20 13:39
Views : 620
wing fences under construction
Don CScratch Built Douglas F4D SkyrayBuild14-Jun-20 13:38
Views : 623
Fuel dump and tail pipe
Don CScratch Built Douglas F4D SkyrayBuild14-Jun-20 13:37
Views : 652
Time for small details.
Hangar Aircraft Category Date Preview
Don CScratch Built Douglas F4D SkyrayBuild11-Jun-20 10:03
Views : 616
The joint smoothed out quite easily. After 3 coats of Thinned dope and a 32 sanding it's time to cover.Got boath top sides done, doped and sanded. Botoms next.
Don CScratch Built Douglas F4D SkyrayBuild09-Jun-20 14:34
Views : 778
Glued them on last night. Infilled holes this morning. worked fairly well.
Don CScratch Built Douglas F4D SkyrayReference06-Jun-20 12:19
Views : 779
Heywoood, Look what I got in the mail Thursday.
Don CScratch Built Douglas F4D SkyrayBuild03-Jun-20 09:59
Views : 711
Still sanding. I've seen allagators with a smoother hide.
Don CScratch Built Douglas F4D SkyrayBuild26-May-20 19:03
Views : 715
Infilling done. 3 hours of sanding on fuse this afternoon. Once the sanding and sanding and - is done the wings can be attached and blended to the fuse. Then silkspan.
Don CScratch Built Douglas F4D SkyrayBuild26-May-20 11:58
Views : 628
I like the design of the wing construction. The ribs are split in the middle alowing for a half to be constructed flat on the plan. Then you simply glue the other half of the ribs in place. No shimming or guessing. Given that, I am trying something different for the infill: one 3/32 strip between each seyt of ribs. On this one the bottom is done. As the camber increases it takes shimming which you can see, but it giges just the right surface. I used the 3/32 so there was enough to sand some off. We shall see.
Page (92 in total) :  <<   11   12   13   14   15   16   17   18   19   20   21   >>  [ < Prev ] [ Next > ]