| Hangar |
Aircraft |
Category |
Date |
Preview |
| poppy | Eureka Boeing B-29 | Build | 24-Jul-09 12:20 |  | | Views : 1089 | | 2 nacelles finished. |
| poppy | Eureka Boeing B-29 | Build | 11-Jul-09 16:00 |  | | Views : 1099 | | Nacelle blocks in place, L/G sitting in place. This is going to be like building 4 small fuselages. I think in the fifties the words "easy build" were not as important as they would be today. |
| poppy | Eureka Boeing B-29 | Build | 29-Jun-09 19:40 |  | | Views : 1246 | |
| poppy | Eureka Boeing B-29 | Build | 29-Jun-09 19:39 |  | | Views : 1041 | | Have to return to lake this week so I thought I would post the full span pics. |
| poppy | Eureka Boeing B-29 | Build | 25-Jun-09 18:47 |  | | Views : 926 | | Full span-right wing. |
| poppy | Eureka Boeing B-29 | Build | 23-Jun-09 18:12 |  | | Views : 1016 | | Another 37" will be added to complete full wingspan. |
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| poppy | Eureka Boeing B-29 | Build | 23-Jun-09 18:11 |  | | Views : 1003 | | Test fit of wing sections. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:20 |  | | Views : 968 | | 3/16" spars added mainly to keep balsa skins from sagging. Inner wings are 20 1/2" inside to outside ribs. Outer wing panel will be 18 1/2" and is removable. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:17 |  | | Views : 938 | | Nacelles frames finished and attached to wing. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:16 |  | | Views : 928 | | Port inner wing frame done. Test fit of engine nacelles. |
| poppy | Eureka Boeing B-29 | Build | 18-Jun-09 15:40 |  | | Views : 1133 | | For scale. The handsome guy is 5'9"". |
| poppy | Eureka Boeing B-29 | Build | 16-Jun-09 11:26 |  | | Views : 1013 | | 1/4" basswood splice joiner. 1/4"X1/4" basswood braces added. They aren't pretty but they do the job. |
|