Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (425 in total) :  <<   222   223   224   225   226  [ 227 ]  228   229   230   231   232   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild23-Mar-10 06:37
Views : 1129
I'll finish sheeting the top out to the break but will not add any more wood to the outer panels.It's raining and the lilac bush just in front of the brick column is showing its first flowers.
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild23-Mar-10 06:33
Views : 1087
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild23-Mar-10 06:32
Views : 1118
I've added some extra stringers to the outer panels for strength and ease of covering.
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild23-Mar-10 06:27
Views : 1071
The bottom has been fully sheeted and filled out to the break (gull).
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild23-Mar-10 06:25
Views : 1036
The top sheeting and two 1/16" stringers have been glued in place. This is as far as the plans go with the bottom wing.
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild23-Mar-10 06:22
Views : 1226
After bending, the landing gear wire is "lashed" to the plywood mount using nylon thread and then given a coat of medium CA. I enlarged the laser cut holes with a T pin. The bottom sheeting is then glued in place.
Hangar Aircraft Category Date Preview
David DuckettGuillows Series 1000 - SBD3 DauntlessParked22-Mar-10 16:31
Views : 3219
Tupolev ANT-25 in Moscow
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild21-Mar-10 15:20
Views : 1082
You can see why it's named Dragon, as in Dragonfly.
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild21-Mar-10 15:19
Views : 1134
The landing gear must be installed before the sheeting can be and that's what the nacelles fit on.
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild21-Mar-10 15:16
Views : 1080
4 long days, 4 long wings
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild20-Mar-10 16:12
Views : 1130
David DuckettDumas Kit #1815,DeHavilland DH89 Dragon RapideBuild20-Mar-10 16:11
Views : 1118
The leading edge is two pieces of 3/32" x 3/8" glued one at a time to the front of the ribs.
Page (425 in total) :  <<   222   223   224   225   226  [ 227 ]  228   229   230   231   232   >>  [ < Prev ] [ Next > ]